Related Posts
NUACHTLITIR UIMH.9 / NEWSLETTER NO. 9
Fáilte go Nuachtlitir uimh. 9 don N22 Forbairt Bóthair N22 Baile Bhuirne – Maigh ChromthaMás mian leat a... read more
N22 BBM Athbhreithniú ar an Dul Chun Cinn déanta i 2021 / Review of Progress Made During 2021
Tá dul chun cinn mór déanta sa tionscadal i gcaitheamh 2021 agus seo a leanas cuid de na... read more
Nóta Faisnéise – Information Note
Tá sraith nua de Europe From Above ag tosú ar chainéal teilifíse National Geographic oíche Dé hAoine 10 Meán... read more
N22BBM FÓGRA POIBLÍ / PUBLIC NOTICE
Report of the West Muskerry A.C Macroom Bypass Run/Walk - GhaeilgeReport of the West Muskerry A.C Macroom Bypass Run/Walk... read more
Movember 2022
The N22 Macroom Bypass Construction Team decided to “Grow the Mo” to raise awareness particularly on mental health within... read more
N22BBM FÓGRA POIBLÍ / PUBLIC NOTICE
Forbairt Bóthair N22 Baile Bhuirne - Maigh Chromtha - N22 Baile Bhuirne to Macroom Road Development.Fógra faisnéise maidir... read more
Mór-dhoirteadh coincréite do Dhroichead Abhann na Biochaille S03 i mBaile Bhuirne / Large Concrete Pour for the Bohill River Bridge S03 at Ballyvourney
Another significant milestone was achieved on the project recently by Jons Civil Engineering/John Cradock JV (the CJV). The bridge... read more
Is é seo an mhórghné dheireanach d’oibreacha ar thionscadal an N22BBM / This is the last major element of works on the N22BBM project
Works on the N22BBM project – GaeilgeWorks on the N22BBM project – English read more
Reopening of Coolyhane Road (Mill Road), Macroom on 10th July 2020
The Coolyhane Road was closed from the 25th May 2020 for seven weeks to facilitate the commencement of construction... read more
Nuachtlitir Uimh. 3 / Newsletter No. 3
Fáilte go Nuachtlitir uimh. 3 don N22 Forbairt Bóthair N22 Baile Bhuirne - Maigh Chromtha.Welcome to Newsletter no.3 of... read more